"TRECESSON PROJECT - Spirit Lake"

Spirit Lake Veins

Spirit Lake Veins (Ruisseau Saint Viateur North Showing)
The two parallel northeast striking, Au bearing, veins lie 150 m. apart in L 60 & 61 - RVIII & L 59 - RVII, Trecesson Twp. Prospecting performed by Knick Exploration in 2011 resulted in $23,750 excess work credits. The veins are in granitic rocks, 2.8 km. north-northeast of North Cossette Vein, following northeast trending sheared, chloritic & carbonate rich mafic dykes-sills, similar to the South Cossette Vein.

On surface the veins are exposed in old trenches & pits, dating back to pre 1936, at widths of up to 1.8 m. These old surface workings show that the West Vein has a strike length of at least 400 m. & 4 grab samples collected while prospecting in 2011 assayed 3.1, 5.7, 9.5 & 18.21 g/t Au. The results of a 8 hole drill program in 1985 indicate the East Vein is at least 500 m. long and may be comprised of more than 1 parallel vein. 15 drill intersected assay results of over 1 g/t Au, were reported, with a best Au result of 3.01 g/t Au across 4.1m.

Click an image for a larger view

Welcome to KNICK


RECENT NEWS RELEASES (2017)

September 26, 2017
STOCKHOUSE NEWS FEATURE FIELD OF DREAMS ON THE TRECESSON PROPERTY COSSETTE GOLD SYSTEM POSTED

September 12, 2017
TRECESSON PROPERTY-COSSETTE GOLD AREA IP SURVEY RESULTS POSITIVE

August 29, 2017
IP SURVEY VREW MOBILIZED TO TRECESSON PROPERTY - COSSTTE GOLD AREA

August 17, 2017
TRECESSON PROPERTY COSSETTE GOLD SYSTEM RESULTS

August 15, 2017
TRECESSON PROPERTY ENLARGEMENT BY STAKING

June 21, 2017
COSSETTE GOLD SYSTEM EXTENDED AND INDICATES WIDTHS AT ITS TRECESSON PROPERTY

June 15, 2017
KNICK DRILLS 6.65 METERS OF 94.40 GRAMS PER TONNE GOLD AT ITS TRECESSON PROPERTY

June 13,2017
PHASE II DRILLING AT THE TRECESSON PROPERTY-COSSETTE GOLD SYSTEM AREA COMPLETED

March 28, 2017
DRILL PROGRAM COMMENCES ON TRECESSON PROPERTY-COSSETTE GOLD SYSTEM